From flat coil to bundled pipe cut to length, every step happens at our works on Sialkot Bypass. Here is the line, in order.

Process
ERW
Steps
6, all in-house
Dispatch
Weighed
Sparks bursting from the weld point of a tube mill as the pipe passes between the squeeze rolls.

Fig. 01Weld point on the tube mill

Step 01 of 06

Coil

Every pipe starts as a coil of flat steel. We buy hot-rolled and galvanized coil and keep it at the works on Sialkot Bypass.

The thickness of the coil becomes the wall of the pipe, so coil is drawn from stock to match the wall thickness on order.

  • Hot-rolled coil
  • Galvanized coil
  • Thickness = wall
A long row of steel coils standing on edge in a dim warehouse, light catching their wound edges.
Fig. 01 Coil in stock, waiting for the slitter
Two steel coils chained down on the flatbed of a truck.
Fig. 01b Coil arriving on the flatbed

Step 02 of 06

Slitting

Coil is slit in-house into narrow strips. The width of the strip decides the size of the pipe: a wider strip closes into a bigger round.

Doing the slitting ourselves means we are not waiting on anyone else to run a size you need.

  • In-house
  • Strip width = pipe size
  • Slit to suit the order
Steel strip and bar running over a roller table beside a large drum in a mill.
Fig. 02 Strip running over the roller table

Step 03 of 06

Forming and welding

On the tube mill, the strip passes through a train of forming rolls that bend it, stand by stand, from flat to round.

At the weld station the two edges are heated and pressed together between squeeze rolls. That is the ERW seam: electric resistance welded, with no filler metal.

  • ERW
  • HRC and GI
  • Continuous run
Close-up of a tube mill weld station: the strip glows orange at the seam between steel squeeze rolls while coolant pours over them.
Fig. 03 The weld point, between the squeeze rolls
Heavy grooved forming rolls on a mill stand, worn and oiled from use.
Fig. 03b Forming rolls on the stand

Step 04 of 06

Sizing and cutting

After welding, the tube runs through sizing rolls that bring it to its finished diameter and round.

At the end of the line the pipe is cut to whatever length the order calls for.

  • Sized to round
  • Cut to order
  • Any length
A tube mill line running in a brick-walled shed, sparks flying from the cut-off saw while two operators in hard hats watch the line.
Fig. 04 The mill running, cut-off saw at work
An abrasive disc cutting through a steel pipe, throwing a fan of sparks.
Fig. 04b A clean cut through the wall

Step 05 of 06

Inspection

Before pipe is bundled it is checked for the things a buyer checks: the seam, the straightness, the length and the wall.

Pipe that does not pass is pulled out of the bundle.

  • Seam
  • Straightness
  • Length + wall
Rows of finished round pipes held in clamps on a rack, receding into the distance.
Fig. 05 Finished lengths on the rack

Step 06 of 06

Weighed dispatch

Pipe is sold by the piece, by the foot or by weight. Whichever way you buy, every truck is weighed before it leaves the gate.

Orders are planned against production, so the dispatch date we give you is the one we are working to.

  • Every truck weighed
  • Piece / foot / weight
  • Across Punjab
A strapped bundle of galvanized steel pipes seen end-on, showing the zinc-coated surface and the wall of each pipe.
Fig. 06 Bundled and ready to load

Need a size
run for you?

Orders are planned against production. Tell us the size, the pipe type and the quantity and we will give you a date to work to.